Chemical

Williams Deethanizer

The turnkey scope included fabrication of over 40 modules, a 5 day turnaround in the existing plant and new construction that included the installation of over 750 piles and the setting of the modules.

Hydrocarbon Unit

JV Driver has successfully completed construction contract for Dow Chemical in Houston Texas. The project included piping installation for the Light Hydrocarbon Unit at their Freeport facility in Texas. The current contract began in January, with a 10 month duration. The scope for this project includes all pipe fabrication and installation for the Unit’s mechanical package, including the supply of valves, specialty items, in-line instruments, pipe supports and miscellaneous steel. In addition to this work, the Houston team is in discussions on further mechanical scopes with this client as other disciplines will become available.

LEP Project

We completed the Williams Energy LEP Project, this work was the front end of Redwater Project – ethane collection from the Suncor Coker. The scope for this project included construction composed of all disciplines.

Turnaround Work

JV Driver Industrial Services (JVDIS) was selected as the sole General Contractor on turnaround work with a valued client, GB Biosciences. JV Driver will provide mainly electrical and instrumentation work as well as some packages including equipment setting, piping, civil and soft craft support. The project began in Q3 2017 and is on track to be completed in Q1 2018.

MNU Plant 64

We constructed Suncor Energy’s MNU Plant 64. The plot area measured 300 feet by 200 feet and incorporated 35,000 ft. of pipe of various types. The mechanical equipment included all types of equipment from pumps and compressors to exchangers. In addition we provided procurement services.

Module Installation

We completed the installation of 28 completed modules at the Formosa Plastics facility in Point Comfort, Texas. As part of this scope, JVDIS received the 28 completed modules from three (3) ships arriving at Calhoun Port Authority and then transported the modules to a staging area located near the port. From the staging area the modules were transported to the Formosa Plastics facility and installed. Prior to receiving the modules, JVDIS completed the survey, earthworks, caisson piles, pile caps and structural steel.

Horizon Hydrogen

The CNRL Horizon H2 Plant is a 144,000 MMSCFD plant including a reformer, 2 compressors and a PSA facility. For this project, JV Driver was the general contractor providing civil, structural, mechanical, piping, electrical and finishes. Our scope included over 859 metric tons of support steel, 21 modules, 1,000 concrete piles, 3,500 cu. meters of concrete foundations, 50,000 ft. of piping, construction of the reformer and pressure parts. Due to high performance, and a record of completing jobs on schedule, more work was continually added to our scope. We took over several of the electrical scopes of work during the project, at which time we successfully mobilized over 150 electricians in less than 3 weeks. The project involved a large amount of alloy welding which was completed with no rework and a weld repair of less than 1%. Further, our scope was completed with 0 Lost Time Accidents and a TRIR of 0.6. Adding to the Safety and Quality accomplishments, during the project JV Driver broke Technip’s world record for most tubes stabbed in 1 day (48 in a single day).