Civil

Wind Farm Substation

Approximately 14,000m3 of rock excavation and installation of (80) 11m rock anchor installation for 16 turbine tower foundations. Work also includes a second contract for forming and placing of 1,000m3 of concrete for wind farm substation.

69kv Transmission Line

The Mission project was an electrical transmission line scope of work that included foundations for 4 new Fraser River Crossing towers on the Abbotsford to Mission 69kv double circuit Transmission Line. Foundations consist of 30 meter piles and reinforced concrete pile caps.

Atlin Hydro Project

This hydro project involved the construction of concrete foundations for powerhouse, pipeline thrustblocks, concrete inlet structure and concrete weir for a 1 MW Run of the River project.

Substation Excavation

IDL has completed the excavation of 60,000 m3 of native material for Fortis, followed by the form and pour of new bases for two switching stations in Duck Lake and Black Mountain. The contract was completed with the installation of ground grid and fencing.

Fall Creek Connector

Constructed a 55km of resource/coal haul road through the Rocky 6 Mountains to accommodate 150 tonne multi-axle haul units including 10 bridges. 160,000 cubic meters of surfacing gravel, 5,000m of culvert. Extensive environmental works.

Modernization Project

The scope of work included: anode baking furnace, carbon office, cast house office, cafeteria & change house and general buildings; major contract works package, underground utilities corridor; structural upgrades; site wide excavations, fill and dewatering, mechanical tie-ins.