Grande Prairie GPEOP

JV Driver completed a new 50MW Dresser Rand Turbo-generator for Weyerhaeuser. The scope of this project included all new foundations, site scaffolding, all piping (including mill tie-ins), a structural pipe-bridge and tower installation, as well as the mechanical installation of the 50 MW Turbo-generator. This work was later expanded to include the construction of a seven effect evaporator set, condensers, tanks and a cool tower. The structure is 250 feet by 50 feet at various heights. JV Driver’s scope includes Civil, Structural, Piping, Mechanical, Scaffolding and Insulation. The Mechanical equipment includes an evaporator set supplied by HPD.

Hydroelectric Project

Skookum Creek hydroelectric project is a 25 megawatt (MW), run-of-river project located approximately 70 km north of Vancouver and 12 km east of Squamish, BC in the Sea to Sky corridor. The project will generate 88,000 megawatt-hours per year of clean, renewable electricity, or enough electricity to power approximately 8,300 homes. The project is located on Skookum Creek, a tributary of the Mamquam River. The project will be connected to the BC Hydro electric system at Squamish via a 20 km, 138kV transmission line. IDL completed the concrete construction of powerhouse and intake along with the associated works.

Conifex Co-Gen

This Cogeneration project included localized demo of older portions of the pulp mill to allow for installation of new Co-Gen. The team was responsible for the installation of a new 36 MW generator and turbine and the supply and install of all piping required.