Mining

Uranium Mine

In a joint venture with English River Constructors, JV Driver Group built the Uranium Slurry Loadout Facility for Cameco Corporation. Using JV Driver Group innovative labour strategies was key to the success of this project. The facility included the largest pachuca tanks ever built in Canada and a 100’ high concrete containment wall that was constructed through extreme weather conditions. Full civil, mechanical, structural, electrical, and instrumentation services were provided for the project. The job was completed in 11 months through an extreme winter, with no Lost Time Accidents.

Belle Plaine Expansion

JV Driver was awarded the Phase 1 Expansion to the Belle Plaine facility. The primary purpose of the expansion is to increase the water availability to the mine field in order to allow further solution mining. The award included the following scope: Two Salt Water Disposal Wells. Our scope is the piling, civil, piping, mechanical, electrical, instrumentation and cladding One Reclaim Brine Pump House. Our scope is the piling, civil, piping, mechanical, electrical, instrumentation and cladding Power House, including the setting of a package boiler. Our scope is the piling, civil, piping, mechanical, electrical, instrumentation and cladding Process Water Building. This building includes two tanks, one a raw water storage tank and the other, the hot water storage tank. Our scope is the piling, civil, piping, mechanical, electrical, instrumentation and cladding 138 KV Substation. Our scope is the piling, civil, structural steel, piping, mechanical, electrical, instrumentation and cladding. In addition, to the construction scope of work we are providing constructability, purchasing and expediting services to our client.

K2 Mine Expansion

We constructed the Compactor Building for the Esterhazy K2 Mine Expansion. Our scope for the 9-story structure included the piping, mechanical, chutes, ducting and a portion of the structural steel. The project incorporated over 3,000 ft. of pipe. The mechanical equipment included multiple drag chain conveyors and elevators. In addition to the construction scope of work we provided purchasing and expediting services to our client.

Highland Valley Copper

In a joint venture with Fluor Canada, JV Driver Group completed a construction contract for Highland Valley Copper which has an open pit copper molybdenum facility at Logan Lake. The scope included the installation of a new pebble crushing facility, upgrades in the existing grinding building, a new floatation facility, upgrades to the existing regent area and a new 138KV transformer. The project had a crew of between 700-900 with over 1,000,000 direct man-hours, consisting of civil, structural, mechanical, piping and electrical disciplines.

Shell Albian Sands

The AOSP Expansion project was a $4B dollar expansion of the existing Shell Albian facility. It included the Jackpine Mine, new extraction, tailings, froth and utilities facilities. Phase 1 ran from Q3 2006 to Q2 2010. We were the general contractor for the extraction and tailings portion of this project and was responsible for the completion of all aspects of the project, including civil, mechanical, structural, tankage, electrical and instrumentation. Our scope was approximately 8 million man-hours. JV Driver was involved with the entire scope of this project, including both labour strategies and constructability. The project was completed meeting schedule and budget milestones, while ensuring quality and safety, with less than 0.5% rework, productivity over 1.15 and no Lost Time Incidents. JV Driver Fabricators completed all fabrication and module construction for JV Driver’s scope of work, including 22 Extraction Modules, 9 Tailings Pump Houses and 49 Froth Modules.